Kollo Gold Project

  • Kollo Gold Project is located on the Doulnia Tenement (Vital 60% earning 80%, Ampella 40%)
  • Over 3.5km of strike length at Kollo with significant areas remain untested along strike
  • Gold mineralisation from surface – suitable for open pit mining
  • 18,000m RC drilling completed, project best intercept of 5m @ 60.36 g/t gold from 75m, including (2m @ 128.50 g/t gold from 76m) KRC260 – high grade shoots plunging to the north-west, open along strike and at depth, further work needed to test the limits:
    • 18m at 2.95 g/t gold from 37m
    • 5m at 3.55g/t gold from 60m
    • 4m at 18.71 g/t gold from 76m
    • 44m at 6.39 g/t gold from 8m including (4m at 58.03g/t gold from 24m)
    • 15m at 7.78 g/t gold from 105m
Kollo drilling plan
Kollo cross section